YASKAWA XGI 1000-65/65 Installation And Operation Manual page 18

Commercial 1000vdc string inverter
Hide thumbs Also See for XGI 1000-65/65:
Table of Contents

Advertisement

Installation and Operation Guide SOLECTRIA XGI 1000 (Rev D)
Place the Wiring Box onto the Mounting Bracket and use 2 of the M6 bolts to attach them. The holes are located
on the sides of the Wiring Box and Mounting Bracket, as shown in Figure 3-5. Torque the connections to 40 in-
lbs. (4.5 N-m).
Figure 3-5 M6 Connecting Bolt (Right Side Shown)
Install the remaining M6 bolt to the bottom of the Wiring Box for the Auxiliary Equipment Grounding Connection
as shown in Figure 3-6.
Figure 3-6 M6 Ground Connection Bolt
DOCR-070733-D
Page 18 of 86

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xgi 1000-60/60Xgi 1000-60/65Solectria xgi 1000 series

Table of Contents