11 - STANDARD MAINTENANCE

Air conditioning equipment must be maintained by profes-sional
technicians,  whilst  routine  checks  can  be  carried  out  locally  by 
specialised technicians. See the standard EN 378-4.
Simple preventive maintenance will allow you to get the best
performance from your HVAC unit:
- improved cooling performance
- reduced power consumption
- prevention of accidental component failure
- prevention of major time-consuming and costly inter-
ventions
- protection of the environment
There are five maintenance levels for HVAC units, as defined by 
the AFNOR X60-010 standard.

11.1 - Level 1 maintenance (see note)

Simple procedure can be carried out by the user:
- Visual inspection for oil traces (sign of a refrigerant leak)
- Air heat exchanger (condenser) cleaning - see chapter
"Condenser coil - level 1"
- Check  for  removed  protection  devices,  and  badly  closed 
doors/covers
- Check the unit alarm report when the unit does not work (see
report in the 30XA/30XAS/30XW Touch Pilot control manual).
General visual inspection for any signs of deterioration.

11.2 - Level 2 maintenance (see note)

This level requires specific know-how in the electrical, hydraulic 
and mechanical fields. It is possible that these skills are available 
locally:  existence  of  a  maintenance  service,  industrial  site, 
specialised subcontractor.
In  these  cases,  the  following  maintenance  operations  are 
recommended.
Carry out all level 1 operations, then:  
- At least once a year tighten the power circuit electrical
connections (see tightening torques table).
- Check  and  re-tighten  all  control/command  connections,  if 
required (see tightening torques table).
- Remove the dust and clean the interior of the control boxes, 
if required.
- Check the presence and the condition of the electrical
protection devices.
- Check the correct operation of all heaters.
- Replace the fuses every 3 years or every 15000 hours (age-
hardening).
- Replace the control box cooling fans used with option 22
(with designation EF22_) every five years.
- Check the height of the anti-vibration mountings (located
between the compressor rails and the unit chassis) after 5
years  of  operation,  and  then  each  year.  When  the  total 
minimum height of the mountings is less than 25 mm replace
the mountings.
- Check the water connections.
- Purge  the  water  circuit  (see  chapter  "Water  flow  control 
procedure").
- Clean the water filter (see chapter "Water flow control
procedure").
- Fully  clean  the  condensers  with  a  low-pressure  jet  and  a 
bio-degradable cleaner (counter-current cleaning - see
chapter "Condenser coil - level 2).
- Replace the stuffing box packing of the pump after 10000 
hours of operation.
- Check the unit operating parameters and compare them with
previous values.
- Keep and maintain a maintenance sheet, attached to each 
HVAC unit.
- Check correct operation of the capacitor (power factor
correction option 231).
34
All these operations require strict observation of adequate safety
measures:  individual  protection  garments,  compliance  with  all 
industry regulations, compliance with applicable local regulations 
and using common sense.
11.3 - Level 3 (or higher) maintenance (see
note)
The  maintenance  at  this  level  requires  specific  skills/approval/
tools and know-how and only the manufacturer, his representative 
or authorised agent are permitted to carry out these operations.
These maintenance operations concern for example:
- A major component replacement (compressor, evaporator)
- Any intervention on the refrigerant circuit (handling refrigerant)
- Changing of parameters set at the factory (application
change)
- Removal or dismantling of the HVAC unit
- Any intervention due to a missed established maintenance
operation
- Any intervention covered by the warranty
NOTE: Any deviation or non-observation of these maintenance
criteria will render the guarantee conditions for the HVAC unit
nul and void, and the manufacturer, Carrier France, will no
longer be held responsible.
11.4 - Tightening torques for the main electrical
connections
Component
Screw on bus bar, customer connection
M8
M10
Soldered screw PE, customer connection (M12)
Tunnel terminal screw, compressor contactor
Contactor 3RT104_
Contactor 3RT105_
Contactor 3RT106_
Tunnel terminal screw, current transformer
Size 2 (3RB2956_)
Compressor earth terminal in the power wiring
control box
Terminal M8
Compressor phase connection terminals M12
Compressor earth connection
Tunnel terminal screw, disconnects 3RV1011_
Tunnel terminal screw, hydraulic pump contactor
Contactor 3RT101_
Contactor 3RT102_
Designation
Value
in the unit
(N·m)
-
18
L1 /L2 /L3
30
PE
70
-
5
-
11
KM_
21
-
11
Gnd
30
1 /2 /3 /4 /5 
25
/6 sur EC_
Gnd sur EC_
25
QF_ /QM_
1
KM90_
1
-
2.2

Advertisement

Table of Contents
loading

Table of Contents