Yamaha Phazer Venture Lite PZ50MTA 2011 Supplementary Service Manual page 61

Table of Contents

Advertisement

SPEC
CABLE ROUTING
PZ50VTA
Clamp the headlight lead to the
inside of the shroud frame.
Shroud stopper
Shroud frame
Headlight lead
Clamp the headlight lead at the
white tape to the shroud frame
with the clamp, making sure to
position the clamp near the
bracket.
Clamp the headlight lead to the
shroud frame with the clamp,
making sure to route the lead
along the bend in the frame.
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents