Yamaha Phazer Venture Lite PZ50MTA 2011 Supplementary Service Manual page 57

Table of Contents

Advertisement

PZ50GTA, PZ50RTA, PZ50MTA
Route the corrugated tube fur-
ther to the rear of the snowmo-
bile than the windshield bracket
and then install it.
Right handlebar switch
Pass the throttle cable over the
handlebar.
Pass the brake hose in behind
of the windshield bracket.
Pass the parking brake cable
behind the windshield bracket.
Left handlebar switch
Pass the left handlebar switch
leads behind the handlebar.
Route the corrugated tube to
the rear of the snowmobile than
the windshield bracket and then
install it.
Windshield bracket
Headlight stay
Auxiliary DC jack
Rectifier/regulator
AC magneto lead coupler
Connect the AC magneto lead
side
coupler
(gray)
rectifier/regulator.
Throttle position sensor coupler
(black)
Clamp the AC magneto lead,
throttle position sensor lead,
wire harness (oil pressure sen-
sor lead and oil pressure switch
lead), and pressure regulator
hose with the clamp.
Pass the AC magneto lead
behind the idle adjusting screw
wire.
Clamp the oil cooler inlet hose,
idle adjusting screw wire, and oil
pressure switch lead with the
clamp. Install the clamp with its
buckle positioned towards the
rear of the snowmobile and its
end facing to the right. Do not
clamp the oil pressure sensor
coupler.
Oil pressure sensor coupler
Pass the oil pressure switch
lead under the idle adjusting
screw, making sure that the lead
is not too taut.
Oil pressure switch coupler
(gray)
Starter motor
Knock sensor
Clamp
Pass the throttle body heater
outlet hose behind the engine
mounting bracket.
To the wire harness
Coolant temperature sensor
Thermostat housing cover
To the parking brake
To the brake
Brake hose
Main switch
Pass the corrugated tube, park-
ing brake cable, throttle cable,
meter lead, and brake hose with
the holder.
Clamp the corrugated tube,
to
the
parking brake cable, throttle
cable, meter lead, and brake
hose with the clamp.
Corrugated tube (engine stop
switch lead, throttle switch lead,
right grip warmer lead, and
thumb warmer lead)
Meter lead
Parking brake cable
Throttle cable
Corrugated
warmer
lead,
warmer adjustment switch lead,
brake light switch lead, and
headlight beam switch lead)
CABLE ROUTING
Install the clamp with its buckle
positioned behind the leads,
cables, and hose and its end
facing to the right. Be sure to
position the corrugated tube
(engine stop switch lead, throt-
tle
warmer
warmer lead) and corrugated
tube (left grip warmer lead, grip/
thumb
switch lead, brake light switch
lead, and headlight beam switch
lead) towards the front and
clamp the throttle cable at the
throttle cable adjusting nut. For
other leads, order insignificant.
Position the corrugated tube
(engine stop switch lead, throt-
tle
warmer
warmer lead) and corrugated
tube (left grip warmer lead, grip/
thumb
switch lead, brake light switch
lead, and headlight beam switch
lead) towards the front of the
guide. For other leads, order
insignificant.
10 mm (0.39 in)
tube
(left
grip
grip/thumb
47
SPEC
switch
lead,
right
grip
lead,
and
thumb
warmer
adjustment
switch
lead,
right
grip
lead,
and
thumb
warmer
adjustment

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents