Checkout Procedures - Trane 4TEE3F48A1000A Installer's Manual

Convertible variable speed – air handlers 3.5 - 5 ton
Hide thumbs Also See for 4TEE3F48A1000A:
Table of Contents

Advertisement

After installation has been completed, it is recommended that the Air Handler be checked against the following
checklist.
1. Make sure power is "OFF" at power disconnect
switch ........................................................................ [ ]
2. Check all field wiring for tight connections. See that
grounding of unit is in accord with code ................. [ ]
3. Make sure unit suspension (if used) is secure and
that there are no tools or loose debris in, around or on
top of the unit ........................................................... [ ]
4. Check all duct outlets; they must be open and unre-
stricted ...................................................................... [ ]
5. Check drain lines and be sure all joints are tight
.................................................................................. [ ]
SUPPLEMENTARY HEATERS CHECKOUT PROCEDURES,
1. Be sure the disconnect switch is "OFF", and safety label (if any) is attached ................................................ [
2. Check on field wiring for tight connections and grounding according to codes ............................................... [
3. Check circuit protection for proper size per nameplate specifications ........................................................... [
4. Check control box panel — in place and secured .......................................................................................... [
NOTE: OPERATION OF HEATERS MUST BE CHECKED DURING THE OPERATION CHECK OF THE TOTAL
SYSTEM.
Trane
6200 Troup Highway
Tyler, TX 75707
www.trane.com
For more information contact
your local dealer (distributor)

CHECKOUT PROCEDURES

IF a heater is USED, see "limitations and recommendations"
to determine if the heater requires a SPECIAL CIRCUIT.
Since the manufacturer has a policy of continuous product and product data improvement, it reserves the
right to change design and specifications without notice.
6. Make sure secondary drain pan is installed ..... [ ]
7. Check power supply for correct requirements per
unit nameplate ......................................................... [ ]
8. Check filters for proper size. Inform owner of
proper procedure for removal and reinstallation .... [ ]
9. Energize the system and carefully observe its op-
eration; make any necessary adjustment ............... [ ]
10. Instruct owner, engineer (if possible) on proper
operating procedure and leave Use and Care Manual
with owner ................................................................ [ ]
]
]
]
]
06/10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4tee3f39a1000a4tee3f48b1000a4tee3f64a1000a

Table of Contents