Spindle Break-In; Recommended Adjustments - Grizzly G0667X Owner's Manual

High precision variable speed 9" x 48" vertical mill w/power feed
Hide thumbs Also See for G0667X:
Table of Contents

Advertisement

Spindle Break-In

NOTICE
Successfully complete the spindle break-in
procedure to avoid rapid wear of spindle
components when placed into operation.
it is essential to closely follow the proper break-in
procedures to ensure trouble-free performance of
your mill.
To perform the spindle break-in procedure:
1.
Make sure the mill is turned OFF and the
spindle is stopped.
2.
Move the spindle speed range selector to the
loW position (refer to Selecting Spindle
Speed Range on Page 29 for detailed instruc-
tions).
3.
turn the machine ON, use the spindle direc-
tion selector to start the spindle rotating, then
adjust the spindle speed dial for a speed of
approximately 280 rpM.
4.
let the mill run at this speed for 20 minutes,
then turn the mill OFF and wait for the spindle
to stop.
5.
Move the spindle speed range selector to the
high position, then turn the machine and
spindle ON.
6.
set the spindle speed at approximately 2500
rpM, then let the mill run for 20 minutes.
7.
turn the mill OFF. the spindle break-in is
now complete and your mill is ready for oper-
ation.
-22-
Recommended
Adjustments
For your convenience, the adjustments listed
below have been performed at the factory.
however, because of the many variables involved
with shipping, we recommend that you at least
verify the following adjustments to ensure the best
possible results from your new machine.
step-by-step instructions for these adjustments
can be found in the SERVICE section starting on
Page 42.
Factory adjustments that should be verified:
1.
gib adjustment (Page 45).
2.
leadscrew backlash adjustment (Page 46).
g0667X high precision Vs Vertical Mill

Advertisement

Table of Contents
loading

Table of Contents