Siemens SINAMICS Equipment Manual page 54

Medium-voltage drives, supplementary component descriptions
Hide thumbs Also See for SINAMICS:
Table of Contents

Advertisement

Option Boards
4.2 Communication Board Ethernet CBE20
Table 4-7
Meaning of the Sync and Fault LEDs on the CBE20
LED
Color
Fault
Red
Sync
Green
52
Status
Description
Off
If the link port LED is green:
The CBE20 is operating error-free. Data is being exchanged with the configured IO
controller.
Flashing
Possible cause:
light
● The response monitoring interval has elapsed.
● Communications is interrupted.
● The IP address is incorrect.
● Incorrect or no configuration.
● Incorrect parameter settings.
● Incorrect or missing device name.
● IO Controller not connected/switched off, although an Ethernet connection has
been established.
● Other CBE20 faults
Continu‐
CBE20 fault error
ous light
● No physical connection to a subnet/switch.
● Incorrect transmission rate
● Full duplex transmission is not activated.
Off
If the link port LED is green:
The Control Unit task system is not synchronized with the IRT clock. An internal sub‐
stitute clock is generated.
Flashing
The Control Unit task system has synchronized with the IRT clock and data is being
light
exchanged.
Continu‐
The Task system and the MC-PLL have synchronized with the IRT clock.
ous light
Supplementary component descriptions
Manual, 06/2019

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents