Overall View; Overall Dimension; Minimum Clearances - Ariston CLAS HE R Installation And Servicing Instructions

Condensing wall-hung gas boiler
Table of Contents

Advertisement

PRODUCT DESCRIPTION

Overall view

1
2
3
4
5
6
7
8
9
10
11
Overall Dimensions
200
200
120
120
96,5
70,7
135
162
8
/
122
52
161
292 (12-18-24 kW)
362 (30 kW)
1. Central heating return
2. Central heating flow
19
3. Burner
18
4. Detection electrode
5. C.H. Return temperature probe
17
6. C.H. Flow temperature probe
7. Manual air vent
8. Gas valve
9. Trap
16
10. Electrical box
15
11. Gas tap
12. Display box
13. Electrical connection box
14
14. Modulating fan
15. Ignition electrodes
16. Ignitor
17. Thermal fuse
18. Combustion analysis test point
19. Flue connector
13
12

Minimum clearances

In order to allow easy access to the boiler for maintenance
operations, The boiler must be installed in accordance with the
clearances stated below.
450
5
5

Advertisement

Table of Contents
loading

Table of Contents