PRODUCT DESCRIPTION
Overall view
1
2
3
4
5
6
7
8
9
10
Overall Dimensions
200
200
120
120
135
8
/
15
14
13
12
11
Minimum clearances
In order to allow easy access to the boiler for maintenance
operations, The boiler must be installed in accordance with the
clearances stated below.
122
52
161
1. Central heating return
2. Central heating flow
3. C.H. Flow temperature probe
4. Burner
5. Detection electrode
6. Silencer
7. Gas valve
8. Trap
9. Gas tap
10. Display box
11. Electrical box
12. Main P.C.B.
13. Modulating fan
14. Combustion analysis test point
15. Flue connector
16. C.H. Return temperature probe
50
50
16
450