JRC JHS-183 Installation Manual page 56

Automatic identification system
Hide thumbs Also See for JHS-183:
Table of Contents

Advertisement

INSTALLATIONS
(5) Installation procedure
Ground sheet
AIS Transponder
Protection sheet
3-6
Fix the ground sheet by the following parts:
1 washer W8
1 spring washer SW8
1 hexagon nut N8
Rubbers 10 x 10 x 10
Fixing procedure
(1) Stick Rubbers on the AIS transponder. The rubbers
(2) Attach with Protection sheet around the pole.
(3) Open the fitting belts with a flathead screwdriver.
(4) Wind the fitting belts around the pole or mast and the
(5) Tighten the fixing belt with torque of approx. 2.45 Nm
(6) Fix the ground sheet with a washer, spring washer, and
200
Pole or Mast
Hexagon nut N8
Spring washer SW8
Washer W8
Pole or Mast
should not touch the pole directly.
AIS Transponder.
with a screwdriver. (See figure below)
a hexagon nut.
Clamp
Tightening Torque: approx. 2.45Nm
Or adjust the deflection within 0.5mm by pressing the fixing
belt strongly with your fingers.
Caution: Do not tighten the belt with excessive torque,
this might break the belt.
AIS
Covering tube
Bending
Approx. 0.5mm
Flathead screw driver
Covering tube
Fix the AIS
Transponder
with the covering tube
Fixing belt
Pole or Mast
Contacting
range
of the clamp
Clamp

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents