Installation Of Ais Transponder - JRC JHS-183 Installation Manual

Automatic identification system
Hide thumbs Also See for JHS-183:
Table of Contents

Advertisement

INSTALLATIONS

3.1.1.2 Installation of AIS Transponder

(1) Installation drawing1
Take care during installation that the
ground bolt does not come into contact
with the radome, otherwise the radome
may be broken.
Rubbers (Attachment)
Ground bolt
(Dock supply)
Ground sheet
(Attachment)
Fixing belts
(Attachment)
Protection sheet
(Attachment)
Pole or Mast
(Dock supply)
Example of reinforcement
(Dock supply)
3-2
NTE-183 AIS Transponder
1.
*1: Seal this section with self-bonding
tape and then wrap with vinyl tape.
2.
*2: When the cable length is 500 mm or
longer, fix it with metal belts along the
pole.
Do not apply tension to the cable during
installation of the equipment.
3. *3:
Seal
this
material made from silicon before fixing
the transponder.
4. The pole or mast must be shock/vibration
free.
5. The equipment must be installed forward
of the funnel to avoid smoke and soot.
6. The equipment must be installed where
*4
environmental temperature is not higher
than 55 deg. C.
RG-10UY
(Dock supply)
*3
Gland 25a (JIS F 8802)
(Dock supply)
Cautions
section
with
a
sealing

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents