Procedure To Calibrate The Dilution Flow Rate - Bunn New Infusion Series Programming Manual

Table of Contents

Advertisement

PROGRAMMING THE BREWER (cont.)
PROGRAMMING FUNCTIONS (cont.)

Procedure to calibrate the dilution flow rate:

1. Place a container, accurately graduated with a
minimum capacity of 130 ounces, under the funnel.
2. Press and hold the right hidden button until the
display reads RECIPES. Press the right hidden
button until the display reads CALIBRATION, then
press SELECT. Press and release the right hidden
switch until the display reads CALIBRATE, then
press SELECT.
3. Select to advance to DILUTION CAL screen.
4. Select side to calibrate.
The display should read CONTAINER READY? If
container is under the funnel, select YES.
5. The display should read CALIBRATE DILUTE. Press
and release any BREW button on the side to be cali-
brated to begin the sprayhead flow for calibration.
The display should read CALIBRATE DILUTE...60
SEC TO FINISH. The 60-second timer on the display
will count down to zero. When the counter reaches
zero, the display will change to LEFT or RIGHT OZ,
along with a number.
6. Measure the amount of water in the container and
use (-) and (+) to match the display to the amount
in the container. Then select DONE.
7. The display should now read NEW L or NEW R
DIL FLOW, along with the correct flow rate of the
sprayhead. After about 5 seconds, the display will
return to the CALIBRATE FLOW screen.
8. Repeat steps 1-7 to calibrate the other side. (For
DDIL models)
9. To exit the CALIBRATE FLOW function and advance
to the next screen, select NO. To exit programming
and return to the MAIN SCREEN, press either EN-
ABLE BREW ON/OFF switch.
Page 23
53867 050117

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

ItcbItcbaItbIcb twinItbaIcb ... Show all

Table of Contents