16
Forecourt Controller Interface Installation Guide
3. Position the first current loop board over the mounting posts in
location 1 above, and secure the board to the posts using the four screws
(P/N SCR-0001) provided with the Current Loop Board kit.
COM Ports
Screw Locations (4)
August 11, 2016