Existing Equipment; Sites Required To Use The Smart Fuel Controller (Sfc); Gilbarco Sites - VeriFone Forecourt Controller Interface Installation Manual

Table of Contents

Advertisement

8

Existing Equipment

Note:

Sites required to use the Smart Fuel Controller (SFC)

Note:
If the site is required to use the Smart Fuel Controller for fuel, then the Current
Loop boards are not needed in the FCI box. The FCI box and RS-485 boards are
still needed for the DCRs. A RS-232 cable is required from the Commander Site
Controller to the SFC box. See the Smart Fuel Controller Installation Guide on
the Verifone Premier Portal at Petro Downloads > Verifone Fuel Controllers >
Smart Fuel Controller for more information.

Gilbarco Sites

If there is an existing distribution box at the site, disconnect the cables from the
box and remove it. It is not used with the Forecourt Controller Interface. The
Forecourt Controller Interface box can be mounted in the same location.
The dispenser control cables will be reconnected to the Forecourt Controller
Interface.
Also, disconnect and remove the PAM. It is not used with the FCI box.
Dispose of all removed components in an appropriate manner as
approved by the site owner.
The Commander Site Controller application must be at base 32 or higher
OR supports POP Discounts and loyalty using the Smart Fuel Controller.
Distribution Box
Dispenser Communications Cables
Forecourt Controller Interface Installation Guide
August 11, 2016

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fci

Table of Contents