Toshiba RAV-GM1101AT8P-E Service Manual page 73

Outdoor unit digital r32 inverter
Hide thumbs Also See for RAV-GM1101AT8P-E:
Table of Contents

Advertisement

No.
Part name
Compressor
7
Compressor lead
Procedure
1. Removal of broken compressor
1) Recover the refrigerant gas.
2) Carry out works of 1 of
3) Remove the piping panel (Front).
Remove screws of the piping panel
(Front) and the bottom plate.
(Hexagonal screw Ø4 × 10, 2 pcs.)
Remove screws of the piping panel
(Front) and the piping panel (Rear).
(Hexagonal screw Ø4 × 10, 1 pc.)
4) Remove the piping panel (Rear).
Remove screws of the piping panel
(Rear) and the bottom plate.
(Hexagonal screw Ø4 × 10, 2 pcs.)
5) Remove the valve fixing plate.
Remove bolts of the valve.
(Hexagonal screw Ø6 × 16, 4 pcs.)
Remove screws of the valve fixing plate
and the partition plate.
(ST1T Ø4 × 10, 1 pc.)
Remove screws of the valve fixing plate
and the accumulator.
(Hexagonal screw Ø4 × 10, 1 pc.)
Cut off the bundling band for the dis-
charge pipe and the suction pipe and
then remove each sensor and coil lead
of PMV.
6) Remove the soundproof plate.
(Upper side, outer winding, inner winding)
7) Remove terminal cover from the
compressor and then remove the
compressor lead and also the
compressor case thermo.
8) Remove TD sensor fixed to the
discharge pipe.
9) Remove the compressor lead.
(Leave the ferrite core attached to the
electric parts box as it is.)
1
and
2
,
3
.
Piping panel (Front)
TD sensor
Compressor
lead
Compressor
case thermo
Accumulator
- 73 -
FILE NO.SVM-18044-2
Remarks
Piping panel (Rear)
Pipe
cover
Bundling
band
Pipe cover, bundling
band, each sensor
(TL,TO,TE,TD,TS
sensors) PMV coil
lead.
Bundling
band, each
sensor
(TL,TO,TE
sensors)
Pipe cover,
bundling band,
each sensor
(TL,TO,TE
,TD sensors)
Suction pipe
TS sensor

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents