Bowflex BXT6 Service Manual page 43

Table of Contents

Advertisement

To reduce the risk of electrical shock or unsupervised usage of the equipment, always unplug the power cord from
!
the wall outlet and wait 5 minutes before cleaning, maintaining or repairing this machine. Place the power cord in
a secure location.
1. Unplug the power cord from the machine and wait 5 minutes. Place the
power cord in a secure location.
2. Using a #2 Phillips screwdriver remove the 4 indicated screws, and two
additional screws on the far side, from the Motor Cover and remove it.
3. Using a #2 Phillips screwdriver remove the 2 indicated screws from the
MCB Cover and remove it.
4. Remove the connectors for the Lower Input/Output (I/O) Cable from the
Motor Control Board after noting its location.
Note: Be sure to note where all cables attach for re-assembly.
5. Using a #2 Phillips screwdriver, disconnect the Grounding Cable from
the Frame Assembly.
Motor Cover
MCB Cover
43
Incline Motor Assembly
Motor Control Board
(MCB)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bxt028Bxt088

Table of Contents