Preparations Before Use - KDF Zircom Instruction Manual

Sintering furnace
Table of Contents

Advertisement

Location & Environment
・Lift the unit up with catching hold of the bottom of the unit and handle on the back of the unit.
・Set up the unit on the center of a flat stable table.
・Keep the unit away from walls and other equipment. Leave the unit minimum of 20cm of space
around the unit.
・Secure the unit with the eyebolt on the back of the unit.
Caution) Set the unit to be able to disconnect the plug easily if problems occur.
Power Requirement
・The unit requires a power outlet with independently wired, 220-240V single-phase, 20A and grounding.
Installation of Quick Firing Stand
・Power on the unit by pressing the power switch button. After Standby mode appears, press the
button to bring down the table.
・Put the provided quick firing stand on the inside of 4 guide pins of firing table.
・Put the quick firing tray stand on the groove.
Unloaded Muffle Firing
・There may be moisture in the firing tray, the firing cover, and firing beads. Before operating for first time,
please follow the unloaded muffle firing process listed below.
1. Put proper amount of beads in the firing tray.
2. Put one firing or two firing trays with its cover on.
3. Choose the course 0 then press [START STOP].
※Unloaded muffle firing takes approximately 7 hours.

Preparations before Use

The installation is finished.
-7-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents