Figure 14. Recommended operating and service clearances –
Model CVGF without unit-mounted starters
CL1/CL2
Table 8. Dimensions for figure 14
Compressor
Shell Size
400-500
500
560-700
700
740-1000
1000
Notes:
CL1 at either end of the machine and is required for tube pull clearance.
CL2 is always at the opposite end of the machine from CL1 and is required for service clearance.
Add 14-5/8" (37.1 cm) on each end for the water box.
CVGF-SVX03B-EN
Width
Length
36" (914 mm)
Recommended
clearance
Clearance Tube Pull
Feet-Inch (mm)
Dimensions Feet-Inch (m-meters)
CL1
CL2
Length
13' 11"
3' 7"
(4.235)
(1.092)
(4.083)
13' 11"
3' 7"
(4.235)
(1.092)
(4.083)
13' 11"
3' 7"
(4.235)
(1.092)
(4.083)
36" (914 mm)
Recommended
clearance
Height
18" (457 mm)
Recommended
clearance
CL1/CL2
Unit Dimensions Without Unit
Mounted Starters
Height
Width
13' 5"
6' 11"
6' 3"
(1.790)
(1.913)
13' 5"
6' 11"
6' 7"
(1.790)
(2.028)
13' 5"
8' 4"
7' 5"
(2.540)
(2.261)
Installation: Mechanical