Installation; Tools Required; Drive Fuses - Trane TR200 Operator's Manual

Vertical bypass/non bypass panel
Hide thumbs Also See for TR200:
Table of Contents

Advertisement

3 Installation

3.1.1 Tools Required

In addition to the standard tool kit, the tools in Table 3.1
are recommended for installation of the option panel.

3.1.2 Drive Fuses

To maintain UL, the drive fuses should be replaced only with the fuses specified in , , , and . If an alternate drive fuse is
desired please consult the factory. See the specifications label inside the cover of the unit for acceptable replacement drive
fuses. A sample of this data can be seen in Table 3.6
UL Motor
HP (KW)
Current
7.5 (5.5)
24,2
10 (7.5)
30,8
15 (11)
46,2
20 (15)
59,4
25 (18.5)
74,8
30 (22)
88
40 (30)
114
50 (37)
143
60 (45)
169
Table 3.2 Drive Fuses 208 V
BAS-SVX49A-EN
Panel (TR200) Non Bypass
& Bypass
P2
P3
P3 - Non Bypass P4 -
Bypass
P4
P5
Spreader bar capable of lifting up to 750 lbs.
Max diameter 0.5 in.
Forklift, crane, hoist or other lifting device capable of handling
up to 750 lbs. (Qualified device operator available for operating
the equipment.)
Metric Socket Set: 7 - 19mm
Socket Extensions: 4, 6, and 12 inch
Torx driver set: T10 - T40
Torque wrench: 6 - 375 lbs-in
Allen Wrenches:1/8, 3/16, 1/4, & 5/16 inches
Metric or English wrenches: 7 - 19mm
Table 3.1 Tools Required
208 V AC
Main Fuse (TR200)
Drive Fuse (TR200)
Bussman
LPJ-40-SP
LPJ-50-SP
LPJ-70-SP
LPJ-90-SP
LPJ-125-SP
LPJ-150-SP
LPJ-175-SP
LPJ-250-SP
LPJ-250-SP
TOOLS
Transformer Fuse (TR200)
Bussman
Bussman
JJN-50
JJN-50
JJN-60
JJN-80
JJN-125
JJN-125
JJN-150
JJN-200
FNQ-R-1.25
JJN-250
FNQ-R-1.25
Installation
3-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents