Installation - Daikin VHF Installation And Maintenance Manual

Vertical stack water source heat pumps
Table of Contents

Advertisement

Figure 37: Remove filter and front panel/filter rack
MicroTech III
Unit Controller
3 . Remove the knockout plate in the front panel/filter rack and cut
away the insulation within the knockout opening
Note: For clarity, not all unit components are shown in
illustrations.
4 . Feed the provided RCN wire harness through the knockout
opening and snap the RCN bezel and board assembly into
the knockout
(Figure
38).
Note: Feed RCN wire harness into the control box through
the top wire hole.
Figure 38: Feed RCN wire harness through front panel
knockout
MicroTech III
Unit Controller
6 . Remove existing wires (if any) from the unit control board
terminal plug (TB2), R, C, W, Y, G2.
7 . Connect the provided (pre-stripped) RCN wire harness
wires to the unit control board plug on terminals R, C, W, Y
& G2 as shown in
Figure 39.
IM 986-11 • Vertical Stack WSHP
Figure 39: RCN wire harness connections to the MicroTech
III unit controller terminal plug
Remove front
panel screws
(10) (Number of
screws may vary,
depending on
unit size)
Remove front
panel knockout
for RCN board
and bezel
(Figure
37).
8 . Reinstall the front panel/filter rack and filter.
Feed RCN
wire harness
into the control
box through
the top wire
hole.
Snap-in RCN
board and
bezel into
knockout
31
i
nstallation
www.DaikinApplied.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

VhwVhc

Table of Contents