York YD480 Series Installation Manual page 35

R-410a 30 - 50 ton 60 hertz
Table of Contents

Advertisement

1034350-UCL-D-0817
Unit inspected for shipping, storage, or rigging damage
Unit installed with proper clearances
Unit installed within slope limitations
Refrigeration system checked for gross leaks (presence of oil)
Terminal screws and wiring connections checked for tightness
Filters installed correctly and clean
Condensate drain trapped properly, refer to Installation Manual
All field wiring (power and control) complete
Is Condenser below Evaporator?
Total Line Length end to end.
Vertical Lift in Ft.
Vertical Fall in Ft.
Number of Elbows?
Liquid Line Size
Suction Line Size
Solenoid Valve?
Check Valves?
Check Valves / Solenoid arrangements installed as per UPG Piping Guide
Oil Separator ?
Accumulator ?
TXV - Hard shutoff
Heatpump
Alignment of drive components
Belt tension adjusted properly
Blower pulleys tight on shaft, bearing set screws tight, wheel tight to shaft
Pressure switch or transducer tubing installed properly
Unitary Products Group
Johnson Controls Unitary Products
REFERENCE
General Inspection
Refrigerant Line Inspection
Air Moving Inspection
5012886-YIM-B-0517
Completed
See Notes
System 1
System 2
Yes
No
Yes
_______ Ft.
_______ Ft.
_______ Ft.
_______ Ft.
_______ Ft.
_______ Ft.
_______ Ea.
_______ Ea.
_______ Ea.
_______ Ea.
_______ Ea.
_______ Ea.
Yes
No
Yes
Yes
No
Yes
Yes
No
Yes
Yes
No
Yes
Yes
No
Yes
Yes
No
Yes
Yes
No
Yes
Completed
See Notes
No
No
No
No
No
No
No
No
3
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yd360 seriesYd600 series

Table of Contents