Operation; Using A 5 Solenoid Torch Manifold - ESAB PT-24 Instruction Manual

Cutting torch for electronic flow controls with high speed marking mechanized cutting
Table of Contents

Advertisement

sectIon 4
4.0 using a 5 solenoid torch Manifold
The 5 solenoid torch manifold allows 1 second conversion from cutting to marking and back to cutting compared
to 7 to 10 second switching delay. The IFC is shipped configured to use the solenoid torch manifold.
cautIon
cautIon
commercial antifreeze Will cause torch to Malfunction
use special torch coolant!
p/n156f05. Due to high electrical conductivity, Do not use tap wa-
ter or commercial antifreeze for torch cooling. a specially formulat-
ed torch coolant is
reQuIreD. this coolant also protects for freezing to –34°c.
operating the unit without coolant will cause permanent damage to
the coolant pump.
coolant p/n 0558004297 is available for temperatures of +12° f.
Marking with the pt-24 torch and the Ifc does not utilize a propor-
tional valve to regulate argon pressure. an external regulator for
the argon supply must be set to 85 psI (5,6 bar). see marking pro-
cess data for more information.


operatIon

Advertisement

Table of Contents
loading

Table of Contents