Assembling the Product
3
Figure 3-89: Signal Cabling Examples of Left Alignment of Switchgear
Figure 3-90: Openings for Cable
20. Turn the termination resistor switch on for the last Switchgear in the CANbus loop.
Figure 3-91: Termination Resistor Setting for Last Switchgear
ET003222373
English 4/2018. Rev 0.0