Preparation Stage - Visual Inspection; Inspecting The Rack Frame; Figure 3-2: Faulty Cases - Samsung 136S Installation Manual

Lithium ion battery system for ups
Hide thumbs Also See for 136S:
Table of Contents

Advertisement

.
Assembling the Product
3

3.7 Preparation Stage - Visual Inspection

During visual inspection, the inspector should check for:
CAUTION
If any defects are found during the inspection, contact the SAMSUNG SDI customer
service department.

3.7.1 Inspecting the Rack Frame

After transporting the rack frame to the installation location, check for:
 Structural damage
 Paint peeling
 Damaged or protruding screws.
After completion, install or package the rack for protection during storage.
14
Missing
Cage
Nut
Missing
Guide
Rail
Guide Rail
Incorrect
Orientation

Figure 3-2: Faulty Cases

ET003222373
English 4/2018. Rev 0.0