3.7.2 Visual Inspection of the Modules
After transporting the modules to the installation location, check for:
Physical damage to the exterior
Damaged or protruding screws
Proper voltage and internal impedance of the battery modules using the battery tester.
Table 3-6: Module Voltage and Internal Impedance
No.
1
2
Internal Impedance Check
After completion, install the battery module in the previously installed rack or return the battery
module to its original packing for protection during storage.
3.7.3 Inspecting the Switchgear
After transporting the Switchgear to its installation location, check for:
Physical damage
Paint peeling
Damaged or protruding screws.
After completion, install the switchgear in the previously installed rack or return the switchgear to its
original packing for protection during storage.
3.7.4 Inspecting the SMPS assembly
After transporting the SMPS Assembly to its installation location, check for:
Physical damage
Paint peeling
Damaged or protruding screws.
After completion, install the SMPS in the previously installed rack or return the SMPS to its original
packing for protection during storage.