Siemens Argus 7SR21 Technical Manual page 545

Overcurrent relay
Hide thumbs Also See for Argus 7SR21:
Table of Contents

Advertisement

P.U.
D.O.
Ph.
Dir
&
TIMING
I
4
TESTS
Calculated Timing values in seconds for TM =1.0
Curve
IEC-NI
IEC-VI
IEC-EI
IEC-LTI
ANSI-MI
ANSI-VI
ANSI-EI
Note that the operate time may be subject to the Minimum op time setting for the element and/or may have a
Follower DTL applied.
If VTS action is set to BLOCK, this option should be tested. Apply balanced voltage and current. Reduce a-phase
voltage to cause a VTS condition. Increase a-phase current and check that the element does not operate.
If VTS action is set to Non-Directional, this option should be tested..Apply balanced voltage and current. Reduce
a-phase voltage to cause a VTS condition. Increase a-phase current and check that the element operates at its
normal setting. Reverse the voltage phase direction whilst checking that the element does not reset.
1.1.1.1
Element Blocking
The Measured Earth Fault elements can be blocked by Binary Input Inhibit, VT Supervision and Inrush Detector
operation. The Characteristic can be made non-directional by VT Supervision. This functionality should be
checked.
Element
51G-1
51G-2
51G-3
51G-4
50G-1
50G-2
50G-3
50G-4
© 2013 Siemens Protection Devices Limited
Char.
Is
(NI EI VI LTI,
TM
(A)
DTL)
2 xIs
10.03
13.50
26.67
120.00
3.80
7.03
9.52
BI Inhibits
7SR210 & 7SR220 Commissioning & Maintenance Guide
Operate Current
P.U.
D.O.
Tol
(Amps)
(Amps)
VTS action
Operate Time
2 x Is
5 x Is
Tol
(sec)
(sec)
5 xIs
4.28
3.38
3.33
30.00
1.69
1.31
1.30
Inrush Detector
Page 33 of 82

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Argus 7sr22

Table of Contents