Installation; Countertop Installation - Follett 15CI100A Installation, Operation And Service Manual

Countertop and freestanding ice and water dispenser with chewblet ice machine
Table of Contents

Advertisement

Installation

CAUTION!
No service or maintenance should be performed until the technician
has thoroughly read this service manual. Except for routine cleaning
and sanitizing, only qualified technicians should attempt to service
or maintain this equipment.

Countertop Installation

1 . A clearance of at least 3" (7.62 cm) is required behind and on
each side of the dispenser for electrical connection and ventilation
(Fig . 1).
2 . Rough-in the electrical service and water line.
§ Electrical: 115 V, single phase, 15A receptacle required. The dispenser
has an integral 8 ft (2.4 m) cord and plug.
§ Water: supply line (with shut-off valve) connects to the dispenser's
1/4" MPT inlet.
NOTICE!
If installing optional Drip Tray Drain Kit or Leg Accessory,
complete those steps before proceeding.
3 . Connect water line.
4 . Connect to the 1/2" ID drain line (Fig . 2 .1) (barb fitting provided) and
route to customer drain. Drain line must slope 6 mm per 30.5 cm run
(1/4" per foot).
5 . Install the storage bin drain tube pinch clamp (Fig . 2 .2). Clamp can
be installed externally or internally. To install internally, see
Internal Components on page
6 . Connect power supply.
7 .
Sanitize the dispenser prior to use (see Page 13).
11.
Fig . 1
Fig . 2
3' (91.4 cm)
Accessing
Plug
15CI100A with Rear Drain
countertop models
minimum 3" (7.62 cm)
clearance required
Valve
1/4" MPT
Storage bin
1
drain tube
pinch clamp
can be
installed
2
externally or
internally.
7

Advertisement

Table of Contents
loading

Table of Contents