Chimneys Already In Use; Cleaning And Inspection Openings; Electrical Connections; Electrical Connection (General) - Potterton Paramount five 50 Installation Manual

Gas condensing boiler
Table of Contents

Advertisement

6 Installation
T
Adjacent to windows or openings on pitched and flat roofs.
U
Below windows or openings on pitched roofs.
(1) In addition, the terminal should be no nearer than 150 mm to an opening in the building fabric formed for the purpose of accommodating
a built-in element such as a window frame.
(2) Only one 25 mm clearance is allowed per installation. If one of the dimensions D, E, F, G or H is 25 mm then the remainder MUST be as
shown in brackets, in accordance with BS 5440-1
6.5

Electrical connections

46
Paramount five 30 – 115
6.4.8

Chimneys already in use

If a chimney used before for oil or solid fuel-fired boilers is used as a shaft
for installation of a concentric exhaust gas pipeline, the chimney must be
thoroughly cleaned first by a specialist.
Important
The concentric flue gas pipe must run straight in the duct.
Height above the roof
With regard to the minimum height above the roof, country-
specific regulations regarding chimneys and flue gas systems
are applicable.
6.4.9

Cleaning and inspection openings

Danger
Clean exhaust gas pipelines!
It should be possible to clean the flue gas pipes and inspect their
free cross-section and leakproofness.
At least one cleaning and inspection opening must be installed in the
installation room of the Paramount.
Exhaust gas pipes in buildings, which cannot be cleaned or inspected from
their port side must have an additional cleaning port in the upper part of
the exhaust system or above the roof.
The exhaust gas pipelines at the outer wall must have at least one
cleaning opening in the lower part of the exhaust gas facility. For exhaust
gas facilities with building heights of < 15.00 m in the vertical section, a
pipeline length of < 2,00 m in the horizontal section and a maximum
pipeline diameter of 150 mm with a maximum deflection (except for
deflection directly at the boiler and in the shaft) one cleaning and
inspection opening in the installation room of the Paramount is sufficient.
The ducts for exhaust gas facilities must not have any openings other than
the necessary cleaning and inspection ports as well as openings for back
ventilation of the exhaust gas pipe.
6.5.1

Electrical connection (general)

Danger of electric shock
Danger to life through incorrect work!
All electrical work in connection with the installation may only be
carried out by a trained electrician.
Mains supply AC 230 V +6% -10%, 50 Hz
In Germany the VDE 0100 and local regulations must be followed during
installation; in all other countries, follow the relevant regulations.
The electrical connection should be made with correct and non-reversible
polarity. In Germany the connection can be executed as an accessible
plug and socket connection with non-reversible polarity or as a fixed
connection. In all other countries, a fixed connection must be provided.
600 mm
2000 mm
7703046 - 01 - 23072018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents