Lucent Technologies PortMaster PM-2 Hardware Installation Manual page 58

Communications server
Table of Contents

Advertisement

Replacing a Fuse
Procedure
1.
Turn the power switch off and disconnect the PortMaster from the power source
(PM-2i shown).
2.
Detach the power cord from the PortMaster.
3.
Insert a 5/32-inch flathead screwdriver between the fuse door and the chassis,
and gently pull the fuse door open.
4.
If the white outer coating of the fuse is discolored (burned), replace the fuse.
The fuse can be inserted from either end.
5.
Press the fuse door shut until it clicks.
6.
Reconnect the power cord to the PortMaster.
7.
Turn the power switch on (PM-2i shown).
A-8
ISDN/U
ISDN/U
ISDN/U
ISDN/U
S0-S1
S2-S3
S4-S5
S6-S7
C0 - DIAG
1189-0023
ISDN/U
ISDN/U
ISDN/U
ISDN/U
S0-S1
S2-S3
S4-S5
S6-S7
C0 - DIAG
Communications Server Hardware Installation Guide
ISDN/U
ISDN/U
S8-S9
HD
ETHERNET
1189-0025
ISDN/U
ISDN/U
S8-S9
HD
ETHERNET
1189-0038

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents