Operating Guide
4.3.6 Disasembling of the Machine
The machine is dissasembled in the oposite order as shown in chapter 4.2. At the end, the cut out piece
shall be removed.
- The pilot drill is loosened by opening the retainer
screw using the proper allen key
- The central drill is pulled out and the coupon is
removed around the drill stem.
- The drill chips are cleaned from the gathering magnet
4.4 Creating the New Branch
For creating the new branch, follow the valve
manufacturers instructions carefully.
- When the Hot Tapping has been acomplished, the
new line can be connected to the Danfoss hot tapping
valve by electric arc welding.
- During that operation, make sure that the sealings
inside the valve are not overheating.
- After the welding and when the line is approved to
start operatiing, open the valve first very slowly.
- Open the valve COMPLETELY afterwards.
- After the valve is completely open, screw the locking
screws to the closing mechanism and weld it shut.
© Danfoss | 2017.06
JIP Hot Tapping Machine
VI.KD.G1.02 | 19