Operating Guide
4.1.4 Testing the Valve
- Before starting the drilling process it is
mandatory to test the closing mechanism of
the valve !
- Use the proper key to close the valve and
open it COMPLETELY afterwards
WARNING: NEVER start drilling if the
valve doesn't close or
open COMPLETELY
10 | VI.KD.G1.02
JIP Hot Tapping Machine
© Danfoss | 2017.06