Tf-Series Assembly Overview; Major Component Descriptions - Roberts Gorden Vantage TF-Series Installation & Operation Manual

The twin fire unitary infrared heater
Table of Contents

Advertisement

ROBERTS GOR DON
®
T F-S
S
E RIE S

TF-SERIES ASSEMBLY OVERVIEW

Major Component Descriptions

Burner with Tube Gasket
Must be installed with the
Burner Tube
Supplied in 10
'
(3 m) lengths. Burner
tube is always the first tube
after the burner.
Reflector End Cap
Punch out center
section to
accommodate heat
exchanger tube.
Tube and Reflector Hanger
with Clamp Package
Position this hanger no more
than 4" (10 cm) away from
the burner.
Tube and Reflector Hanger
Suspend system from these
hangers.
Reflector Support Strap &
Wire Form
Flex Gas Line with
Shut Off Cock
© 2004 Roberts-Gordon
S
UB MI TT AL
HEE T
flame observation
window facing down.
APPLICATION S, ENGI NEERING AND DETAI LED GUID ANCE ON SYSTEMS DE SIGN, INSTAL LATI ON AND PRODUCT PE RFORMANCE IS AVAI LABLE UPON RE QUEST. ROBERT S GORDON
INSTALLED ONLY IN ACCORDANCE WI TH LOCAL LAWS, CODES AND REGUL AT IONS, AND ONLY BY A CONT RACT OR QUALI FIE D I N THE I NST ALL AT ION AND SE RVICE OF GAS-FIRE D HE AT ING EQUI PME NT.
Reflector
(Aluminum or
Stainless
Steel)
Alternate overlap as
shown on overview and
on Page 10, Figure .
Minimum overlap is 7" (18 cm).
Tube
Hot Rolled or Heat
Treated Aluminized Tube
Supplied in 10' (3 m) lengths.
Turbulator
Turbulator must be
installed in the last standard
section of tube. Turbulator is
not required on the TF-250/
300/350/380. For installation
see Page 15, Section .
Coupling Assembly
with Lock
Flexible Boot
Flexible boot is used to
connect the last tube to
the vent.
Vent Sleeve
Vent Sleeve installed
inside flexible boot.
PRODUCT S ARE T O BE
®

Advertisement

Table of Contents
loading

Table of Contents