Tube Clamp Package Installation; Coupling And Tube Assembly - Roberts Gorden Vantage TF-Series Installation & Operation Manual

The twin fire unitary infrared heater
Table of Contents

Advertisement

ROBERTS GOR DON
®
T F-S
S
E RIE S

Tube Clamp Package Installation

Description
Part Number
Tube Clamp Package
01318901
Tube Clamp
01396801
Bolt
97113940
Flat Washer
95211600
Nut
92113900

Coupling and Tube Assembly

A
Close coupling
with tab
C
Insert tubes into coupling
© 2004 Roberts-Gordon
S
UB MI TT AL
HEE T
APPLICATION S, ENGI NEERING AND DETAI LED GUID ANCE ON SYSTEMS DE SIGN, INSTAL LATI ON AND PRODUCT PE RFORMANCE IS AVAI LABLE UPON RE QUEST. ROBERT S GORDON
INSTALLED ONLY IN ACCORDANCE WI TH LOCAL LAWS, CODES AND REGUL AT IONS, AND ONLY BY A CONT RACT OR QUALI FIE D I N THE I NST ALL AT ION AND SE RVICE OF GAS-FIRE D HE AT ING EQUI PME NT.
B
Start Slide bar/Coupling Lock
onto coupling
D
Tighten coupling to join tubes
Descr iption
Part Number
Coupling
01329600
Slide bar/Coupling Lock
01329700
Tube
91409XXX
PRODUCT S ARE T O BE
®

Advertisement

Table of Contents
loading

Table of Contents