HEATER INSTALLATION

Critical Hanger Placement

Total Str aight Length (both sides) or Length from U-Tube to U-Tube
in a Double "U" Layout
If the installation requires a shorter suspension length than the minimum listed, the suspension
length may be reduced by 6" (16 cm). In this case tube clamps MUST be used at the two farthest
hangers on each side of the burner. See Page 8, Figure .
Description
S-Hook
Tube/Reflector Hanger
© 2004 Roberts-Gordon
S
UB MI TT AL
HEE T
0' - 50'
51' - 60'
61' - 80'
81' - 100'
101' - 120'
121' - 140'
141' - 160'
Par t Number
91907302
03090100
APPLICATION S, ENGI NEERING AND DETAI LED GUID ANCE ON SYSTEMS DE SIGN, INSTAL LATI ON AND PRODUCT PE RFORMANCE IS AVAI LABLE UPON RE QUEST. ROBERT S GORDON
INSTALLED ONLY IN ACCORDANCE WI TH LOCAL LAWS, CODES AND REGUL AT IONS, AND ONLY BY A CONT RACT OR QUALI FIE D I N THE I NST ALL AT ION AND SE RVICE OF GAS-FIRE D HE AT ING EQUI PME NT.
Typical Expansion
Minimum "X" Length
Each Side
±1" (3 cm)
±2" (5 cm)
±3" (8 cm)
±4" (10 cm)
±5" (13 cm)
±6" (15 cm)
42" (107 cm)
±7" (18 cm)
48" (122 cm)
12" (31 cm)
18" (46 cm)
24" (61 cm)
30" (76 cm)
36" (91 cm)
PRODUCT S ARE T O BE
®