Installation Space - Toshiba MMU-AP0091H Owner's Manual Installation And Operation

Super heat recovery multi system
Hide thumbs Also See for MMU-AP0091H:
Table of Contents

Advertisement

3
SELECTION OF INSTALLATION PLACE

Installation space

• Make space for installation and service. (Make space to the electrical parts box cover side for service.)
• When installing the unit inside the ceiling, be sure to create a check port.
The check port is required when the unit is installed and serviced. (Check port: 450 × 450 or more)
• Keep a clearance of 50mm or more between the top panel of the unit and the ceiling.
• The length of a connection pipe to the indoor unit should be 15m or less.
<Installation space>
RBM-Y1122FE, RBM-Y1802FE
<RBM-Y1122FE, RBM-Y1802FE>
50 or more
200 or more
50 or more
<RBM-Y1122FE (When attached pipes are used)>
(156)
50 or more
(118)
(159)
50 or more
300 or more
RBM-Y2802FE
<RBM-Y2802FE (When attached pipes are used)>
198
100 or more
210
400 or more
100 or more
Outdoor unit side
Refrigerant pipe
connecting port
(Discharge gas)
Refrigerant pipe
connecting port
(Liquid)
Refrigerant pipe
connecting port
200 or more
(Suction gas)
(159)
(118)
300 or more
210
400 or more
69
Indoor unit side
Refrigerant pipe
connecting port
(Liquid)
Refrigerant pipe
connecting port
(Gas)
Hanging bracket
Electrical parts
box cover
Check port,
450 × 450
Electrical parts
box cover
Check port,
600 × 600

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents