Vertical Applications With Furnaces; Horizontal Right Application With Furnaces; Horizontal Left Application With Furnaces; Upflow - Pc Coil Installation With Furnace - York MC18A Installation Manual

Full-cased multi-position for cooling/heat pumps
Hide thumbs Also See for MC18A:
Table of Contents

Advertisement

Furnace
UPFLOW
FIGURE 6: Vertical Applications with Furnaces
For upflow or downflow applications (FC/MC Models):
These coils are factory shipped for installation in either upflow or down-
flow applications with a minor conversion.
1. Remove and reposition the coil duct flanges as shown in figure 5 if
needed.
2. Position the coil on the furnace opening (or the furnace on the coil
for downflow) as shown in Figure 6.
3. Place the ductwork over the coil (or furnace) duct flanges and
secure.
4. Check for air leakage between the furnace and coil casing and seal
appropriately. Three tie plates are provided with the coils. If
needed, secure the coil to the furnace using these tie plates.
5. See sections on "Refrigerant Line Connections" and "Condensate
Drain Connections" for further installation instruction.
For horizontal applications (MC models only):
MC model coils are supplied ready to be installed in a horizontal posi-
tion. A horizontal drain pan is factory installed.
1. Remove and reposition the coil duct flanges as shown in figure 5 if
needed.
2. Position the coil and furnace as shown in Figure 7.
3. Place the ductwork over the coil or furnace duct flanges and
secure.
4. Check for air leakage between the furnace and coil casing and seal
appropriately. Three mounting plates are provided with the coils.
The mounting plates must be used to secure the top edges of the
furnace and coil together. See figures 7 and 8.
5. See sections on "Refrigerant Line Connections" and "Condensate
Drain Connections" for further installation instruction.
Furnace
FIGURE 7: Horizontal Right Application with Furnaces
Furnace
DOWNFLOW
FIGURE 8: Horizontal Left Application with Furnaces
FURNACE ASSEMBLY - PC
The PC coils are designed for installation on top of upflow furnaces
only.
If the coil is used with a furnace of a different size, use a 45° transition
to allow proper air distribution through the coil.
1. Remove and reposition the coil duct flanges as shown in figure 5 if
needed.
2. Position the coil casing over the furnace opening as shown in Fig-
ure 9.
3. Place the ductwork over the coil duct flange and secure.
4. Check for air leakage between the furnace and coil casing and seal
appropriately.
NOTICE
Refer to the heat pump add-on control instruction before installing an
add-on heat pump coil.
C
(Min.)
D
Field
Fabricated
Ductwork
Upflow Coil
Upflow Furnace
Primary Drain
FIGURE 9: Upflow - PC Coil Installation with Furnace
TABLE 5: Coil Projection Dimensions - PC Coils
COIL SIZE
PC18
PC24
PC30, PC32, PC35
PC42, PC43, PC36, PC37
PC48
PC60
Dimension "C" should be at least 2/3 of dimension "D". See Figure 9.
5353649-UIM-A-0617
Furnace
Flexible Duct
Collar
DO NOT Drill or
Screw this Flange
Alternate
Drain Location
Secondary Drain
DIMENSION "C" INCH
3-1/2
4-1/2
4-1/2
5-1/2
6-1/2
9
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents