Document ID: 2097898
1. Insert the EVAP canister into the track and slide it into position.
Caution:
Refer to
2. Install the EVAP emission canister flange bolt.
Tighten
Tighten the evaporative emission canister flange bolt to 20 N·m (15 lb ft).
3. Connect the canister fuel vapor hoses.
http://localhost:9001/si/showDoc.do?docSyskey=2097898&pubCellSyskey=124356&pubO...
Fastener Caution
in the Preface section.
Page 2 of 2
7/6/2010