Biasi RIVA COMBI Service Manual page 48

Wall hung gas boiler for central heating and domestic hot water supply
Table of Contents

Advertisement

___________________________________________________________________________________________________
Third Part
_______________________________________________________________
probe D (Figure 4) and then disconnect the
cable from the control p.c.b.
5) Reassemble the Temperature probe carrying
out the removal operations in reverse order.
RIVA COMBI SERVICE MANUAL – REV A
D
Figure 4
(edition-0106)
Temperature Probe NTC
12-2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents