3.1.4
Wiring (installation)
Conduct the electrical connections in accordance with local regulations on
electrical installations as well as chapter 6.2 "Connection terminals" on page 39.
The cable endings must be prepared before as follows:
Cable glands (not contained in scope of delivery)
Metric
M16
· Without cable gland IP protection is not guaranteed!
· Guide the cable in a loop to the cable gland, so water can drop off.
Prior to installation, the following preconditions must be satisfied:
· Actuator is mechanically connected to a Siemens valve.
· Housing cover is removed.