Suzuki Wagon R Plus RB310 Service Manual page 375

Table of Contents

Advertisement

6A2-36 ENGINE MECHANICAL (M13 ENGINE)
1
2
2
1
2
1
(a)
(b)
4
(b)
5
8) Remove water outlet cap (1) from timing chain cover (2).
9) Remove timing chain cover.
10) Remove oil gallery pipe No.1 (1) and oil control valve (2)
3
Installation
1) Clean sealing surface on timing chain cover, cylinder block
2) Install new O-ring (1) to oil control valve (2).
3) Install oil control valve to timing chain cover (3).
Tightening torque
Oil control valve mounting nut
(a): 11 N·m (1.1 kg-m, 8.0 lb-ft)
4) Install oil gallery pipe No.1 (4) with new copper washers (5)
Tightening torque
Oil gallery pipe No.1 bolt
(b): 30 N·m (3.0 kg-m, 21.5 lb-ft)
3
from timing chain cover (3).
and cylinder head.
Remove oil, old sealant and dust from sealing surface.
Tighten nuts to specification.
to timing chain cover.
Tighten bolts to specification.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wagon r plus rb413

Table of Contents