Repressurising System & 'Service Due - Baxi Megaflo 2 System 24 Compact User's Operating Instructions & Important Warranty Information

Gas fired wall mounted condensing system boiler
Hide thumbs Also See for Megaflo 2 System 24 Compact:
Table of Contents

Advertisement

Front, Side Panel and
Control Box
removed for clarity
Fig. 1
Fig. 2
'Service Due'
Message
'Sd' will show for
three seconds,
alternating with the
boiler temperature.
© Baxi Heating UK Ltd 2013
Pressure Gauge
View Under
Appliance
2
1
0
bar
Normal Pressure
2
1
0
bar
Requires
Repressurising
R
4.0 Repressurising System &
'Service Due'
4.1
Central Heating System Pressure
1. The normal operating water pressure is between 1
and 2.5 bar (Fig. 1). If the pressure exceeds 3 bar the
safety pressure valve will operate and a fault is indicated
(E117 displayed). Contact your installer.
2. It may be necessary to repressurise the system
occasionally (as Fig. 2 or E118 displayed). A filling device
(the filling loop) will be fitted on the system. This will be
on the boiler itself, or on pipework near to the boiler.
3. If you are unsure of its position, or cannot identify it,
consult the installer who fitted the boiler.
Note: It is recommended that repressurising is
performed when the boiler & system are cool.
4. The filling loop supplied consists of two taps and a
separate copper pipe with connection fittings.
5. Only when repressurising should the copper pipe be
connected between the two taps. Ensure that the nuts
on the pipe ends are tightened onto the taps.
6. Fully open one of the taps first, and then while
3
watching the pressure gauge, carefully open the second
tap.
4
7. The system pressure is shown at all times on the
gauge under the boiler and can be viewed on the display
when there is power to the boiler.
8. To check the water pressure press
displayed. This will alternate with the system pressure.
(NOTE: When the pump is running the gauge under the
boiler may show a slightly different reading to the
display) .
3
9. When the needle on the gauge or figures on the
display indicate 1 or more turn both taps off.
4
10. Disconnect the copper pipe from the taps (a small
amount of water may be present) and remove it. Keep
the pipe in a safe place for future use.
4.2
'Service Due' Message
1. After 11 months operation the 'Service Due' message will
be shown on the boiler display.
2. Please contact 'heateam' - The Service Division of Baxi to
arrange your Annual Service. You can contact 'heateam'
0844 241 2502 or e-mail field.trial.uk@bdrthermea.com
until
is
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents