Repressurising System - Baxi Platinum Combi 24 User Manual

Gas fired wall mounted condensing combination boiler
Hide thumbs Also See for Platinum Combi 24:
Table of Contents

Advertisement

3.0 Repressurising System

3.1
Central Heating System Pressure
1. The normal operating water pressure is between 1
and 2.5 bar (Fig. 1). If the pressure exceeds 3 bar the
2
safety pressure valve will operate and a fault is indicated.
1
Contact your installer.
3
2. It may be necessary to repressurise the system
4
0
occasionally (Fig. 2). A filling device (the filling loop) will
bar
be fitted on the system. This will be on the boiler itself,
or on pipework near to the boiler.
Normal Pressure
3. If you are unsure of its position, or cannot identify it,
Fig. 1
consult the installer who fitted the boiler.
4. The filling loop consists of two taps and a separate
copper pipe with connection fittings.
2
5. Only when repressurising should the copper pipe be
1
3
connected between the two taps. Ensure that the nuts
on the pipe ends are tightened onto the taps.
0
4
6. Fully open one of the taps first, and then while
bar
watching the pressure gauge, carefully open the second
tap.
Requires
Repressurising
7. When the needle on the gauge is indicating 1 or more
Fig. 2
turn both taps off.
8. Disconnect the copper pipe from the taps (a small
amount of water may be present) and remove it. Keep
the pipe in a safe place for future use.
Filling Loop
Connections
Fig. 3
6
© Baxi Heating UK Ltd 2015

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents