Installing under floor heating
Hydro unit
Heat
installation
exchanger
on water
side
⑭
①
⑥
⑫
① Water pipe joint (union, flange) ⑤ Flexible joint
② Thermometer
③ Manometer
④ Ball valve
⑬ Water Valve
On site installation specification
Strainer
Model name
AM160FNBF✴✴
AM250FNBF✴✴
0~100 ℓ/min
ADN160BDE✴✴
AM160FNBD✴✴
#50 PT 1
ADN320BDE✴✴
0~100 ℓ/min
AM320FNBD✴✴
ADN500BDE✴✴
#50
0~150 ℓ/min
AM500FNBD✴✴
PT 1-1/4
On site
Ball valve (Used as
cleaning hole)
②
③
Cleaning device
④
⑪
⑦
⑥ Drain (within the product)
⑦ Pump
⑧ Air vent
⑭ Pressure relief valve (Pressure safety valve)
Flow meter
Thermometer
Manometer
0~50 ℓ/min
0~50 ℓ/min
0~100 °C
0~100 °C
Hot water tank
⑧
⑤
⑩
⑨
⑬
⑨ Expansion tank
⑩ Temperature sensor for thermal storage tank
⑪ Drain valve
⑫ Strainer
Air vent
Pump
23 ℓ/min
36 ℓ/min
0.6 m
3
/h
48 ℓ/min
0~1 MPa
(Condition:
92 ℓ/min
0.15 MPa)
(Refer to
pressure
drop graph)
150 ℓ/min
0.6 m
3
/h
(Refer to
0~1 MPa
(Condition:
pressure
0.15 MPa)
drop graph)
Under floor
heating coil
Water out
Water in
Ball valve Drain valve
PT 1
15 A
PT 1-1/4
15 A
21