Commissioning; Set Maximum Temperature And Commissioning Cycle - Mira Advance ATL Installation & User Manual

Electric shower 9.0 and 9.8 kw, adjustable temperature limit thermostatic
Hide thumbs Also See for Advance ATL:
Table of Contents

Advertisement

Important! on initial installation, the appliance needs to 'learn' about the site
conditions and does so during the commissioning cycle. It is important that the shower
is commissioned correctly otherwise an error condition may occur. once set, the
shower constantly updates it's memory with information about the site conditions to
deliver the best performance.

set Maximum Temperature and Commissioning Cycle

1. If the appliance is running, push
start/stop to turn it off. The pulsing
light and "beep" indicates that the
appliance is shutting down.
Important! Do noT isolate the
power to the appliance as this may
result in a temporary malfunction.
3. Wait until the water has stopped
flowing and turn off the power to the
appliance, residual water may drain
over a few minutes.
5.
power to appliance, check for blue
light.

CoMMIssIonInG

2. The appliance will purge water from
4.
20
its tank for a few seconds.
Important! Do noT isolate the
power to the appliance.
Turn dial to desired position in table.
will set the maximum showering
temperature (i.e. position 5 = Max
Temp of 41°c).
(See also section: 'beab care').
Max.
no.
Temp
°C
1
37
2
38
3
39
4
40
5
41
6
42
7
45
8
48
This