Figure 4-5 Set the terminal type
Router Power-on
Checklist for Router Power-On
Before powering on the router, check that:
The power cord and ground cable are correctly connected.
The voltage of the power source conforms to voltage requirement of the router.
The console cable is correctly connected, the configuration terminal is powered on, and the
emulation program is properly configured.
If an external CF card is needed to store applications, the CF card is properly installed.
Before powering on the router, locate the position of the power switch for the equipment room
where you will operate so that you can switch off the power supply promptly in case of any
accident
Powering On the Router
Turn on the power source.
Turn on the power switch on the router.
Checklist/Operations after Router Power-on
After powering on the router, check that: