Transmitter Installation - Emerson Rosemount 2051 Quick Start Manual

Pressure transmitter / flowmeter transmitter, with foundation protocol
Hide thumbs Also See for Rosemount 2051:
Table of Contents

Advertisement

Quick Start Guide

Transmitter installation

Step 1: Mount the transmitter
Liquid applications
1. Place taps to the side of the
line.
2. Mount beside or below the
taps.
3. Mount the transmitter so
that the drain/vent valves are
oriented upward.
Gas applications
1. Place taps in the top or side of
the line.
2. Mount beside or above the
taps.
Steam applications
1. Place taps to the side of the
line.
2. Mount beside or below the
taps.
3. Fill impulse lines with water.
4
Coplanar
Coplanar
Coplanar
October 2014
In-Line
In-Line
In-Line

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rosemount 2051cf series

Table of Contents