Vertical Stabilizer Installation - FMS 2000MM Beaver DHC-2 Operating Manual

Hide thumbs Also See for 2000MM Beaver DHC-2:
Table of Contents

Advertisement

Vertical Stabilizer Installation

1.
Connect the rudder and elevator servo connectors to the servo extensions in the fuselage.
2.
Slide the vertical tail assembly into the slot in the fuselage.
CAUTION: DO NOT crush or damage the wiring when attaching the vertical tail assembly to the fuselage.
3.
Secure the assembly to the fuselage using 2 screws as shown. Long screw in front hole, shorter screw in rear
hole.
CAUTION:Make sure the screw is tight enough, or it may cause a crash.When needed, disassemble in reverse
order.
Landing Gear Set Installation
Attach the landing gear set on the botton of fuselage. Install three screws in the landing gear flat side and two
screws in both sides.
HKM3.0×26mm
fig6
fig8
6
HKM3.0×26mm
fig7
HKM3.0×26mm
fig9

Advertisement

Table of Contents
loading

Table of Contents