Initial Start-Up - Bunn My Cafe AP Technical Training Manual

Table of Contents

Advertisement

Initial Start-Up

Step 1: Place a large empty cup (10 oz. or more) under the brew chamber.
Step 2: Connect the brewer to the power source.
Step 3: Water will flow into the tank and stop when the tank is filled to its capacity.
Step 4: Wait approximately ten minutes for the water in the tank to heat to the proper temperature. Display will show
HEATING until tank reaches its operating temperature.
Step 5: When heated, press and release th open door switch and close door by pressing the same switch.
PLEASE WAIT
DOOR OPENING
Step 6: Press the large Brew Switch. Water will flow into the cup. When finished, discard contents of cup.
Step 7: Water volumes and flow settings have been preset at the factory. Refer to adjustments for the Set Brew Vol-
umes section of this manual should the volume need to be increased or decreased.
PLEASE WAIT
Flow Counts
8. The brewer is now ready for use in accordance with instructions for coffee brewing.
PLEASE WAIT
TANK FILLING
PRESS POD
IN DRAWER
PRE-INFUSION
FLOW COUNTS XXX
ENJOY YOUR BEVERAGE
BREWING COMPLETE
HEATING
PRESS CLOSE
Brewing
PLEASE WAIT
BREWING COMPLETE
Bunn-O-Matic Corporation
Select Brew
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents