Step 2. Check the Inventory

To verify that you have all the items shipped with the pSeries 670, use the packing lists for each ship
group.
The contents of the pSeries 670 tool kit are as follows:
Quantity
Description
5
Pad Cleaning Brush
2
Door Key
1
MCM Torque Wrench
1
L3 Support Tray
1
Magnifier Lens
1
Wrench
1
DASD Tool
1
Test Card
1
Tool Box Kit
2
Insertion Tool
1
Book Assembly
1
Tool Kit Case
1
Screwdriver
1
ASM Tool
Verify with the customer that the following items are available. You will need them to complete this
installation.
v A floor plan, showing where to place each rack
v The items necessary for installing a modem, including the correct telephone jack, power cords, cables,
and a power source
For information about the HMC inventory, refer to the IBM Hardware Management Console for pSeries
Installation and Operations Guide.

Rack Inventory

The following is a list of rack inventory items:
v Front and rear door for the rack
v Two power cords
v Optional display and keyboard
Chapter 2. Installing the pSeries 670
9