Chapter 1. Setting Up The System; Step 1. Checking Inventory - IBM eServer p Series Installation Manual

Hide thumbs Also See for eServer p Series:
Table of Contents

Advertisement

Chapter 1. Setting Up the System

This chapter provides procedures to help you set up your RS/6000 Enterprise Server
Model H80, or Eserver pSeries 660 Models 6H0 and 6H1.
The system is a multiprocessor, multibus system packaged in drawers. The processors
and memory are packaged in a 5 EIA-unit central electronics complex (CEC drawer),
and the I/O devices are in a 5 EIA-unit I/O drawer. The basic system consists of one
CEC drawer and one or two I/O drawers in the same rack. Connections between the
CEC drawer and I/O drawers are made through a number of cables.

Step 1. Checking Inventory

Before you begin the installation, check your inventory.
__ 1. The list of parts that are shipped with the system is as follows:
__ 2.
__ 3. PCI Adapter Placement Reference , SA38-0538
__ 4. System Unit Safety Information , SA23-2652
__ 5. Support Information and Warranty
Verify with the customer that the following items are available. You will need them to
complete this installation.
v A floor plan, showing where to place each rack.
v A console, including cables and a power source.
v A modem for the electronic customer-support function (if the customer ordered this
function). This includes the correct telephone jack, cables, and a power source.
v Drawer to rack mount brackets (four each).
v Latch reset bracket (four each).
v Nut clip (nine each).
v Screws (nine each).
v Left rail (four each).
v Right rail (four each).
v Nut clip (nine each).
v Screws (nine each).
RS/6000 Enterprise Server Model H80, Eserver pSeries 660 Models 6H0 and
6H1 Installation Guide , SA38-0575 (this book)
1

Advertisement

Table of Contents
loading

Table of Contents